Skip to content
Construction works in the neutral zone of 17 km of a 220 kV double- circuit overhead power transmission line at the facility: Construction of a Turkmenistan-Afghanistan-Pakistan power transmission line (TAP)Администратор2022-05-15T19:33:38+03:00
Construction works of substations 220 kV “turn-key” at the facility: Construction of a center for repair and maintenance of power equipment & gas turbine installationsАдминистратор2022-05-15T19:26:55+03:00
Corrosion protection “turn-key” works: Construction of a center for repair and maintenance of power equipment & gas turbine installationsАдминистратор2022-05-15T19:22:30+03:00
Steel Structures Installation, roofing and facade sandwich panels “turn-key” at the facility: Construction of a center for repair and maintenance of power equipment & gas turbine installationsАдминистратор2022-05-15T19:09:29+03:00
Excavation works: Construction of the Electricity Transmission Line Turkmenistan-Afghanistan-PakistanАдминистратор2022-05-15T19:04:27+03:00
Highway construction of 40 km at the facility: Power line construction Turkmenistan -Afghanistan-PakistanАдминистратор2022-05-15T18:55:18+03:00
Page load link