Mechanized cleaning of the collector-drainage network with a length of 31 km in the district of GeroglyАдминистратор2022-05-16T00:15:37+03:00
A modern greenhouse complex on 10 hectares in the Kunya-Urgench etrap of the Dashoguz velayatАдминистратор2022-05-15T21:12:04+03:00
Installation of a gypsum workshop for the HTS Luxury Hotel projectАдминистратор2022-05-15T21:05:43+03:00
Construction of the facility: “BOSIET Training Center, located in the industrial zone of Ak Bugday etrap, Akhal provinceАдминистратор2022-05-15T21:02:09+03:00
Reconstruction of an art school in Khazar townАдминистратор2022-05-15T20:59:48+03:00
Floor painting at the warehouse at Base 2 of the Schlumberger Lodzhelko Inc. in Turkmenistan in the city of BalkanabadАдминистратор2022-05-15T20:56:52+03:00
Production and installation of steel structuresАдминистратор2022-05-15T20:54:19+03:00
Construction of a center for repair and maintenance of power equipment and gas turbine installationАдминистратор2022-05-15T20:51:20+03:00
Reconstruction of industrial safety systems at the Khazar Integrated Oil Treatment FactoryАдминистратор2022-05-15T20:48:06+03:00
Construction of a power transmission line Turkmenistan-Afghanistan-Pakistan “TAP” 220 kW overhead lineАдминистратор2022-05-15T20:42:15+03:00