Construction of a power transmission line Turkmenistan-Afghanistan-Pakistan”. Substation 220 kWАдминистратор2022-05-15T20:26:19+03:00
Installation works – in the neutral zone of 17 km of a 220 kV double-circuit overhead power transmission line at the facility: Construction of a Turkmenistan-Afghanistan-Pakistan power transmission line (TAP)Администратор2022-05-15T20:23:30+03:00
Installation and commissioning works, 87.64 km long of a two-circuit overhead power transmission line at the facility: Construction of a Turkmenistan-Afghanistan-Pakistan power transmission line (TAP)Администратор2022-05-15T20:20:23+03:00
Construction, installation of “Turn-key” relay towers at the facility: Construction of a power transmission line Turkmenistan-Afghanistan-PakistanАдминистратор2022-05-15T20:17:12+03:00
Installation of automatic water, powder fire extinguishing systems, pre-commissioning & commissioningАдминистратор2022-05-15T20:10:44+03:00
Construction and installation works of the boiler house, pumping station, commissioning works at the facility: Construction of a center for repair and maintenance of power equipment & gas turbine installationsАдминистратор2022-05-15T20:08:22+03:00
Installation of an industrial supply and exhaust ventilation system with cooling at the facility: Construction of a center for repair and maintenance of power equipment & gas turbine installationsАдминистратор2022-05-15T20:00:24+03:00
Installation of power supply systems at the facility: Construction of the Turkmenistan-Afghanistan-Pakistan power transmission line (TAP)Администратор2022-05-15T19:55:57+03:00
EPIC for Upgrade of F&G Detection & Fire Alarm Systems at 7 platformsАдминистратор2022-05-15T19:48:15+03:00